Smoky Gray - WBS15-1

Smoky Gray - WBS15-1

$115.46
$96.98
In Stock
SKU#: SM-WBS15-1
QTY
  • Description

    Smoky Gray - Waste Basket 15"-1 Insert (Order 1 Rv358) - 11 1/4" W X 17 1/2" H X 21"D With 1 Trash Can (Each 35 Qt)

  • Additional information

    <div class="w-full flex flex-col"><div class="flex flex-row gap-4 mb-3 last:mb-0"> <div class="text-sm font-semibold text-left flex-shrink-0 min-w-[30%]">Weight</div> <div class="text-sm text-[var(--color-font)] flex-1">20.00</div> </div></div>